Document
IGN 4-00-04 Certification requirements for sewer CCTV survey operatives in AMP 8 (2025 – 2030)
Introduction
This guidance has been prepared by the CCTV Sub-Group of SIN (Water UK’s Sewerage Infrastructure Network). SIN’s members have endorsed the guidance and recommend its adoption by water companies, but this is not mandatory. The Water UK Standards Board has approved its publication in the format of one of the Board’s IGN (Information and Guidance Notes).
Respond to this Draft WIS/IGN
Use the commenting form to make comments on the WIS / IGN that is out for public comment. Upload your completed commenting form below. Please read the downloadable Guidance Notes before completing the commenting form. Comments received in other formats will not be considered.