Skip to content
Secure Login

Document

IGN 4-00-04 Certification requirements for sewer CCTV survey operatives in AMP8 (2025 – 2030)

Introduction

This guidance has been prepared by the CCTV Sub-Group of SIN (Water UK’s Sewerage Infrastructure Network). SIN’s members have endorsed the guidance and recommend its adoption by water companies, but this is not mandatory. The Water UK Standards Board has approved its publication in the format of one of the Board’s IGN (Information and Guidance Notes).

The aim of this guidance is to recommend that organisations move towards a consistent use of the latest MSCC standard (currently MSCC5, MSCC6 when available) in Asset Management Plan period 8 (AMP8).

Respond to this WIS/IGN

Use the commenting form to make comments on an existing WIS or IGN. Upload your completed commenting form below. Please read the downloadable Guidance Notes before completing the commenting form. Comments received in other formats will not be considered.

Accepted file types: doc, docx, Max. file size: 10 MB.
Accepted file types: doc, docx, Max. file size: 10 MB.