Document
Specification for leaktightness testing of Cured-In-Place-Pipe lining systems
This draft document has been prepared by a Task and Finish Group (T&FG) chaired by a representative of Thames Water. The Group contains representatives from four other UK water companies, the Government of Jersey and eight CIPP lining system suppliers. The draft WIS is open for three-months public comment before finalisation and publication on the Water UK Standards Board website.
Comments on the draft will be forwarded to the T&FG for review.
Respond to this Draft WIS/IGN
Use the commenting form to make comments on the WIS / IGN that is out for public comment. Upload your completed commenting form below. Please read the downloadable Guidance Notes before completing the commenting form. Comments received in other formats will not be considered.